Suite Layout Planning
- Bedroom, walk-in, bath, and optional sitting area are arranged for privacy from the rest of the house.
- Door swings and furniture clearances use real mattress and dresser sizes, not abstract boxes.
- Bath and closet adjacency is fixed early because plumbing and HVAC chase with them.
- Morning-flow order (bed to bath to closet to door) is the layout test that catches awkward plans on paper.
- Suite entries get a vestibule or offset sightline — the room shouldn't read from the hallway.
Planning a project like this? Get an estimate.
